Datong-Qinhuangdao Railway

  • 网络大秦铁路;大秦线
Datong-Qinhuangdao RailwayDatong-Qinhuangdao Railway
  1. Analysis on Renovation Scheme of Datong-Qinhuangdao Railway 40 Million Ton Traction Power Supply System

    大秦线4亿t牵引供电改造方案浅析

  2. The Analysis is made for the achievements , economic benefits , the converted turnover per capita accomplished and the contributions to the national economic development from the Datong-Qinhuangdao railway heavy-haul transportation for 10 years .

    分析了大秦线重载运输10年来所取得的业绩、经济效益、人均完成的换算周转量,以及对国民经济发展所作出的贡献。

  3. Track Maintenance Problems and Countermeasures Elementary Study on Track Maintenance for Datong-Qinhuangdao Railway

    铁路线路维修的一些问题及解决方法的研究

  4. Analysis of the Particularity of Calculating Carrying Capacity of Datong-Qinhuangdao Railway

    大秦铁路通过能力计算的特殊性分析

  5. The author suggests a new system to do track maintenance and repair work separately on Datong-Qinhuangdao Railway Line .

    建议大秦铁路线路养护维修工作试行养修分离新体制。

  6. Relays with Special Functions Driven by Computer-based Interlocking for Datong-Qinhuangdao Railway

    大秦线计算机联锁驱动的特殊使用功能继电器

  7. Influence on the Reception-Departure Yard of Hudong Marshalling Station by 20 000 t Heavy Haul Train Running on Datong-Qinhuangdao Railway Line

    大秦线开行2万t重载列车对湖东编组站到发场的影响

  8. With reference to actual construction of project , analyzes the feasibility of taking advantage of the existing cantilever structure of Datong-Qinhuangdao railway 200-million-ton heavy load electrification renovation project , providing a reference to determine the principle of taking advantage of the existing cantilever .

    结合实际工程,对大秦线2亿吨扩能电气化配套工程中既有腕臂结构利旧的可行性进行了分析,为确定利旧原则提供了参考;

  9. This paper analyses the quality of voltage of signal main power , that is 10 kV auto blocking power in Datong-Qinhuangdao Railway , finds out the causes of the quality problem and raises some advices which have been obtaining good results after implementation of those advices .

    本文对大秦线信号主电源,即10kV自闭电源的电压质量进行了分析,找出了10kV自闭电压质量问题的原因,提出了一些改造建议并加以实施,取得了良好效果。

  10. Datong-Qinhuangdao railway is the national " Eighth Five-Year " during the key construction projects , is the first article to coal-based , open line of heavy elements tons , 20,000 tons train , equipped with modern technology and modern means of transport organizations double electrified railway .

    大秦铁路是国家八五期间重点建设项目,是我国第一条以运煤为主,开行重载单元万吨、2万吨列车,具有现代化技术装备和现代运输组织手段的双线电气化铁路。

  11. Research methods : By studying documentation and taking Datong-Qinhuangdao Heavy-haul railway for example , this paper determines the working scope and rational effective length of the receiving-departure track for heavy load train in technical station .

    研究方法:通过文献研究并以大秦线为例,确定重载铁路技术站到发线作业内容及合理的到发线有效长度;

  12. Construction of Datong-Qinhuangdao Heavy Haul Railway and Operation Management Technique

    大秦重载铁路修建及运营管理技术